โพสต์ใน: วิศวกรรม ใน Southampton | Posted: |
You shall ensure adequate number of planning staff (scoping) competent in boiler, piping and mechanical trade skills in line with the requirements listed in CWCP Section 3.1.10.
Planning and Scheduling- our client may ask you to provide resources for Planning and or Scheduling, or both.
Outline of roles:
* Planner compiles the necessary information from the Work scope into a Job Pack or similar with enough detail to be able to complete the work to the desired outcome.
The Job Pack should provide details such as.
* Relevant SHE information
* Quality i.e. WIP’s, or other supporting maintenance standards
* Job Steps- including interactions, relevant Process plan interactions, required trades and durations.
* Engineering, drawings or other technical information
* Applicable procedures
* Materials, note that the Planner would typically source the materials.
Scheduler manages a Scheduling tool, typically Primavera (or Microsoft Project).
* The Schedule provides the organisation with the details of when an activity is likely to take place.
* Enables the necessary resources to be understood and allocated.
* Helps define the overall duration including critical and sub-critical paths
* Updates progress, hours earned.
* Provides insight into progress, including focus on potential Schedule slippage.
* Provides a forecast of work completion timing.
A more detailed Job Description for these functions will be included in the Exhibit A Scope of Work specific to each contract where applicable